This page walks through a Southern Roof Surveys report section by section so you know what you are paying for before you book. Every report follows the same structure, whether it is a £199 drone report or a £399 pre-purchase report, and every photograph is numbered against a plan of the roof. A downloadable sample PDF will appear on this page shortly.

20–40
Pages
25+
Numbered photos
4
Condition grades
48h
Delivered
A printed roof condition report open on a kitchen table showing the roof plan, numbered photographs and graded schedule, with a drone controller beside it
✓ No repairs sold
✓ PI insured
✓ CAA drone pilot
✓ Report in 48 hours
✓ Fixed prices from £199

Every report, section by section

A Southern Roof Surveys report is a PDF of typically 15 to 30 pages. It opens with a summary and overall grade, then describes the property and roof, grades each element with numbered photographs, records the loft inspection, sets out a costed repair schedule in banded ranges, estimates remaining life, and closes with a photo appendix and roof plan.

Last reviewed by Matt Novell

Section 1

1. Cover and instruction details

Property address, client name, who the report is addressed to, date of inspection, date of issue, product purchased and the surveyor's name. The reference number used on all photographs and correspondence appears here.

Section 2

2. Summary and overall grade

One page. The overall traffic-light grade, which element drives it, the three or four findings that matter most, headline repair cost band by urgency, remaining-life estimate for the main covering, and any item that would affect a lender's decision, such as spray foam.

Section 3

3. Scope and limitations

What was inspected and how: which slopes by drone, which by pole camera, whether the loft was accessible, weather on the day, and any part of the roof that could not be seen. Each NI grade in the report is explained here.

Section 4

4. Property and roof description

Age and type of property, roof form, main covering and its approximate age, secondary coverings such as flat-roof extensions, chimneys, roof windows, solar panels, and any evidence of previous re-roofing or repair.

Section 5

5. Element-by-element condition

A table and narrative for each element: main covering by slope, ridges, hips, valleys, flashings, chimneys, verges, eaves, gutters, fascias and soffits, flat roofs. Each receives a grade, a description and the reference numbers of the photographs that show it.

Section 6

6. Loft inspection

Full and Pre-Purchase reports only. Inspected from the hatch: rafters, purlins and struts, underlay or sarking felt, insulation type and depth, ventilation at eaves and ridge, water staining and its location, signs of condensation, and a specific statement on spray foam insulation.

Section 7

7. Thermal imaging findings (where ordered)

Included when the £75 thermal add-on is booked. Thermal images paired with normal photographs, the temperature anomalies found, the most likely entry point for each, and a plain statement of what thermal imaging can and cannot show on that roof.

Section 8

8. Repair schedule and remaining life

Each defect numbered, located, described, graded for urgency and given a cost band. Totals for immediate, 12-month and five-year works. The remaining-life estimate as a range with the assumptions behind it. Headed "budget indication, not a quotation".

Section 9

9. Photo appendix and roof plan

25 to 40 or more numbered photographs, each captioned with the element, the defect reference and the direction of view. A plan of the roof with each photograph's position marked, so anyone pricing the work can find every defect without a second inspection.

Download the sample report

A complete nine-page Pre-Purchase Roof Report on a fictional 1930s semi in Fleet: summary and costs, the one-page lender summary, element-by-element findings, loft inspection, repair schedule and photograph appendix. Photographs are illustrative.

How do I read the report?

Start with the summary on page two. It gives the overall grade, the three or four findings that matter most, the headline repair cost band and the remaining-life estimate. If you read nothing else, that page tells you whether the roof is a problem. The detail behind each line is in the element-by-element section.

Each defect has a reference number, for example D7. That number appears in the element table, in the repair schedule and on the photograph, and the photograph's position is marked on the roof plan at the back. If a contractor asks where D7 is, you can show them a plan with a cross on the rear valley and a photograph of the cracked lead. That is the point of the numbering: nobody has to go back up to find what we found.

The scope and limitations section is not boilerplate. It tells you which slopes were photographed by drone, which by pole camera and why, whether the loft was fully inspected or partly obstructed, and what we could not see. If a slope is marked NI, this section says what stopped us. A report that does not tell you what it did not see is not telling you much.

What do the grades mean?

Each element receives one of four grades. Grade 1 is serviceable with no action needed. Grade 2 is a defect that should be repaired within 12 months. Grade 3 is a serious defect to be repaired before exchange or within three months. NI means not inspected, with the reason stated beside it.

The overall grade is not an average. A roof with eleven Grade 1 elements and one Grade 3 valley is a Grade 3 roof, because water does not care that the rest of the roof is fine. We say which element drives the grade and what it would take to bring it down. For buyers this is the line to put in front of the vendor: fix D4 and D9 and the roof is Grade 2.

Grade 2 is where most 1960s to 1990s roofs sit. It means the roof is doing its job today but has defects that will cost more if left: a handful of slipped tiles, a cracked ridge bedding, a gutter joint dripping onto a fascia. The 12-month window is a planning horizon, not a countdown. We show the cost band so you can budget rather than panic.

How are the repair costs worked out?

Every item in the repair schedule carries a cost band, for example £400 to £900, and the schedule is headed "budget indication, not a quotation". The bands come from current contractor pricing in Hampshire, Surrey and Berkshire, with a 15 to 25 per cent uplift noted for London postcodes where labour costs more.

Bands are honest about uncertainty. A slipped tile is £150 to £350 because the price depends on whether the tile is a current profile or a discontinued one, and whether scaffolding or a tower is needed. A lead valley is £400 to £900 because it depends on length and whether the adjacent tiles come up cleanly. A full re-roof is £4,000 to £15,000 across the whole range of house sizes and coverings, and we narrow it for your property.

The schedule groups items by urgency: immediate, within 12 months, and within five years. Totals are given for each group. On a pre-purchase report those three totals go straight onto the lender summary page, because they are what a lender uses to size a retention. On a landlord's report they become next year's maintenance budget.

  • Roof repair, individual items: £150 to £900
  • Flat roof renewal: £800 to £6,000
  • Guttering, fascias and soffits: £80 to £2,000
  • Chimney repairs and re-pointing: £150 to £800 and upward
  • Full re-roof: £4,000 to £15,000 depending on size and covering
  • London postcodes: add 15 to 25 per cent for labour

What is on the lender summary page?

The lender summary is a single page included with the Pre-Purchase Roof Report. It quotes the valuer's wording from the mortgage valuation, states the overall grade, gives immediate, 12-month and five-year cost totals, the remaining-life estimate, whether the roof is acceptable security now or only after works, and an independence statement.

There is no national lender template for roof reports, so we wrote the page to answer the questions every lender asks. It is addressed to the lender or solicitor by name when you tell us at booking. The surveyor signs it, and the professional indemnity insurer and policy limit are stated beneath the signature. A valuer reviewing a retention usually wants exactly that page and nothing more; the full report is there if they want it.

If the roof has spray foam insulation in the loft, the lender page says so in its own line, with the type (open or closed cell), the coverage, whether the timbers could be seen, and a removal cost band. Many lenders now decline on spray foam or require removal, and a page that confronts it directly is more use to the buyer than one that buries it on page 14.

Report in 48 hours, lender-ready01252 447 731Book online

Which roof survey do you need?

Pre-Purchase Roof Survey

A pre-purchase roof survey is an independent inspection of a house you are buying, carried out before exchange of contracts.

From £399Usually within five working days

Roof Survey for Mortgage

A roof survey for mortgage purposes is an independent inspection ordered because the lender's valuer has flagged the roof.

From £399Usually within five working days

Roof Condition Report

A roof condition report is an independent document describing the condition of every roof element, graded 1 to 3 on a traffic-light scale, with numbered photographs, a costed repair schedule in bands and a remaining-life estimate.

From £299Usually within five working days

Drone Roof Survey

A drone roof survey is a close-range photographic inspection of a roof from the air by a CAA-registered operator.

From £199Usually within five working days

Roof Insurance Claim Report

A roof insurance claim report is an independent, photographed record of roof damage prepared to support a buildings insurance claim.

From £299Usually within five working days

Spray Foam Roof Inspection

A spray foam roof inspection records the type of foam applied under a roof, open or closed cell, the proportion covered, whether the rafters and felt beneath can be inspected, evidence of damp or decay, and ventilation.

From £299Usually within five working days

Landlord Roof Inspection

A landlord roof inspection is an independent, graded condition report on a rented property's roof, loft and gutters, used to evidence compliance with Section 11 of the Landlord and Tenant Act 1985 and the Homes (Fitness for Human Habitation) Act 2018, to plan maintenance and to answer tenant damp reports.

From £299Usually within five working days

Roof Leak Detection Survey

A roof leak detection survey traces water entry from the ceiling stain back to the external defect.

From £299Usually within five working days

Pre-Solar Roof Survey

A pre-solar roof survey assesses whether a roof is fit to carry solar panels for their 25-year life.

From £299Usually within five working days

Sample report questions

Typically 15 to 30 pages depending on the roof and the product. A drone report on a simple two-slope roof may be 12 pages. A Pre-Purchase report on a large Victorian house with three chimneys, two valleys and a flat-roofed extension can run past 35. Most of the length is photographs, which we would rather include.

Yes, and that is how it is designed to be used. Every defect is numbered, photographed and marked on the roof plan with a description and a cost band. A contractor can quote item by item without re-inspecting, and you can compare two quotes against the same list. The report stays yours to share with whoever you choose.

The sample we are preparing for this page is based on a real inspection with the address and client details removed. It will show the full structure, grading, photo numbering and roof plan exactly as a client receives them. Until it is uploaded, this page describes each section and you can call us to talk through a real example.

The structure is the same. What changes is the addressee and the emphasis. An insurance report gives more space to separating storm damage from wear and includes dated weather references. A landlord's report flags items relevant to the Homes (Fitness for Human Habitation) Act 2018 and suggests a re-inspection interval. Tell us the purpose at booking.